AMAYAMAY
AMAY · 40+ YEARS OF EXPERTISE
··

Mining engineering bureau — over 40 years of experience in Morocco's mines

For international investors · Studies · Realization · Participation

Investing in Moroccan mining,AMAY — from deposit to plant.

Morocco, mineral-rich land: 1st world reserve of phosphate, 3rd world producer of cobalt, world-class deposits of gold, copper, silver, lead, zinc, manganese. AMAY is the engineering bureau supporting international investors across the full cycle — geological studies, due diligence, EIA, flotation plant realization and equity participation.

40+
Years of experience
1500 T
Daily capacity reached
8+
Major projects delivered
Gold
Copper
Silver
Lead
Zinc
Cobalt
Manganese
Barite
Fluorite
Iron
Antimony
Phosphate
Gold
Copper
Silver
Lead
Zinc
Cobalt
Manganese
Barite
Fluorite
Iron
Antimony
Phosphate
§ 02 · Our involvement

The bridge between your capital and Moroccan deposits.

Studies — Realization — Participation. AMAY is the reference engineering bureau for international investors entering the Moroccan mining market. We handle the entire cycle, from deposit to production. No administrative barriers, no hidden technical risks.

Transparency guarantee

Detailed quote and signed projected timeline before any commitment. No hidden fees, no surprise costs.

Discuss my project
  1. 01

    Feasibility studies

    due diligence, on-site geological audit, EIA via CRI, mass balance, full sizing and scenario-based business case.

    Included
  2. 02

    Plant realization

    Design and installation of flotation units from 5 to 50+ T/H. Equipment sourcing, supervised assembly, commissioning and operator training.

    Included
  3. 03

    Project participation

    Co-investment and joint venture on viable projects after due diligence. Long-term support through to production.

    Included
  4. 04

    Asset management

    Regulatory compliance, title renewals, declarations, regular audits and upgrade of existing installations.

    Included
§ 04 · Process

Four steps. From deposit to production.

  1. 01
    Lead time
    Within 48 h

    Project scoping

    You describe the project: target mining title, deposit, mineral, ambition. We assess administrative and technical feasibility.

  2. 02
    Lead time
    2 to 6 months

    Complete studies

    due diligence, on-site geological audit, EIA via CRI, mass balance, sizing and scenario-based business case.

  3. 03
    Lead time
    6 to 18 months

    Realization

    Permit obtainment, design and installation of the flotation plant, sourcing, assembly, commissioning, training.

  4. 04
    Lead time
    Continuous production

    Participation & follow-up

    Production, regulatory compliance, renewals, regular technical audits. Co-investment possible on viable projects.

Free scoping · Within 48 h

Describe your project, we'll get back to you quickly.

One of our engineers reviews your project — mining title, deposit, plant sizing — and sends you a scoping document with no commitment.

§ 05 · Questions

Answers to common questions.

Yes. Several international mining groups have entrusted us with their studies and due diligence. We also support setting up the local legal entity when needed.
Gold, copper, silver, lead, zinc, cobalt, manganese, barite, fluorite, iron, antimony. All substances classified as mining in Morocco, except phosphate (regulated separately by OCP).
Yes, under conditions. On viable projects after due diligence, AMAY can enter joint venture or co-investment. This is our Participation business.
18 to 36 months depending on complexity: 2-6 months of complete studies, 6-12 months for permit and EIA, 6-18 months for plant realization and commissioning.
Variable by project. Small flotation unit (~5 T/H) from 1-5 M MAD. Industrial unit (20+ T/H): 15-50 M MAD. Detailed quote is free after scoping.
All mining regions of Morocco: Anti-Atlas, Drâa-Tafilalet, Souss-Massa, Béni Mellal-Khénifra, Oriental, Marrakech-Safi. Our references span the entire territory.
§ 06 · Project scoping

Let's discuss your mining project.

Free scoping within 48 h. No commitment before a detailed quote. Response from a dedicated engineer.

  • Studies · Realization · Participation
  • Data processed confidentially
  • Domestic and international investors
Confidentiality

Your details are never resold. They are used only to scope your mining project.

Form · D-01
Confidential

By submitting, you agree to be contacted.

Free diagnostic
Request my file